Case study

Caulfield Apartments

Hot water systems and air conditioning units with no trays over occupied apartments, on a roof nobody else would inspect.

Caulfield Apartments

The access was the reason nobody had looked

Access to this roof was poor enough that no other waterproofer was willing to go up and establish what the problem actually was. We took it on.

What was up there was a compliance problem before it was a waterproofing one. The hot water systems had no trays underneath them. Sitting above an occupied apartment, that is a legal requirement, not a preference - and the units were heavy enough that no contractor had been prepared to lift them to put one in.

Thermal imaging confirmed the rest. Behind the air conditioning units the waterproofing had not been applied correctly, and beside the drainage the membrane that had been used was never rated to sit under water. Once water started ponding there, it broke down.

How it went

  1. 01

    What was up there

    Hot water systems standing straight on the roof with no trays under them, and water ponding around their bases. Above an occupied apartment a tray is a legal requirement, not a preference.

    Hot water systems standing directly on the roof with water ponding around their basesA hot water unit sitting on the roof with no tray beneath itPonding and debris beside the roof drainage outlet
  2. 02

    Where the membrane had failed

    Beside the drainage the membrane had never been rated to sit under water, so once it started ponding it broke down. Thermal imaging had already told us what the staining underneath confirmed.

    Membrane breaking up where it had been left sitting under standing waterWater staining on the underside of the roof slab
  3. 03

    Lifting the units, rebuilding underneath

    We engineered a way to lift the hot water systems safely, ground the outlet back, waterproofed the roof under them with a system rated for standing water, and installed compliant trays before setting them down again.

    The drainage outlet ground back and prepared for the new system
  4. 04

    Finished

    Everything is back on compliant trays and the roof is waterproofed under the units rather than around them.

The outcome

Hot water systems and air conditioning units heavy enough that no other contractor would lift them are back on compliant trays, with the roof waterproofed underneath rather than around them, and a membrane beside the drainage that is rated for the water it actually sits in.

Got a leak? Let's find the source.

If any of that sounds like your building, the first step is the same one every time: find out where the water is actually getting in.